Showing posts with label Energy Management. Show all posts
Showing posts with label Energy Management. Show all posts

Wednesday, June 19, 2013

Aline Wilmot Skaggs Biology Air Handler and Cooling System Project



Recently the chiller in the Aline Wilmot Skaggs Biology building was replaced with a new evaporative cooling unit by Facility Operations due to chronic temperature control problems.  The new equipment has software control that allows for full maximization of the system. A change to the sequence of operations better utilizes the wet bulb temperatures to keep the building cool without the use of chillers. Chillers, like more familiar household air-conditioning units, are used in large buildings to cool the water used in industrial air-conditioning practices.

Evaporative technology is older but with the use of advanced technology through the control software, the unit is able to cool more efficiently. When temperatures reached 100 degrees Monday, June 10th the unit was able to maintain 55 degree air discharge temperature through the use of evaporative cooling which cooled the building to 72 degrees inside.

Evaporative cooling is used in both new and older buildings where applicable. For example, the new business building has an evaporative and indirect cooling system alongside chillers.  The savings in emissions and energy use are substantial when able to use evaporative and indirect cooling systems.

Those consulted on this project were Building Automations, HVAC, Facility Operations, Energy Management, Sustainability, and Russ Weaver at Atkinson Electronics. This is the type of teamwork, dedication, and innovation that contributes to the continued success of the University of Utah.

Thursday, November 8, 2012

2012 Facility & Construction Operations Service Project

It's that time of year again, our annual service project.  This year we are partnering with the Univeristy Veterans Services Department and our quilting and donations will be going to the Veterans Hospital and the Veterans Nursing Home

Quilting is scheduled during the lunch hour.  Donation jars and bins are available with your division secretaries and various shop locations.  We would like to see all of the divisions within Facility & Construction Operations particiate in this project.  See your division secretary if your area hasn't signed up for a quilting day yet.

This year in keeping with our Olympic theme we will be passing the service torch from shop to shop as they participate.




The service torch is blazing a trail through our shops! Where will it end up next?

We appreciate all of the support and participation we have received on this project, without it this would not be possible.